• offutt 7
  • offutt 6
  • offutt 3
  • offutt 1
  • offutt 4
  • offutt 2
  • Home
  • Resources
  • Online Library

Offutt AFB JLUS (Final, August 2015)

The final Offutt Air Force Base (AFB) Joint Land Use Study (JLUS) has been completed and is available for download. The final document set is based on input and comments from the public, local jurisdictions, federal and state agencies, Offutt AFB.

The final Offutt AFB JLUS document set is comprised of the following three documents. Click on the cover image to open a document.

 

offutt afb jlus executive summary thumbnail

JLUS Executive Summary

The JLUS Executive Summary serves as a quick reference describing the purpose of a JLUS and providing an overview of the key JLUS recommendations and Military Compatibility Areas.

3.3 Mb file download
(download time will vary based on your connection speed)

offutt afb jlus report final thumbnail

JLUS Report

The JLUS Report presents an overview of the JLUS planning process, purpose and objectives of the study and the recommended Implementation Plan.

8.5 Mb file download
(download time will vary based on your connection speed)

offutt afb jlus background report thumbnail

JLUS Background Report

The Offutt AFB JLUS Background Report provides the technical background and detailed compatibility assessment that was used to identify issues and develop JLUS recommendations.

18.9 Mb file download
(download time will vary based on your connection speed)

 

 

 

Print Email

Public Draft JLUS Review Period

The Metropolitan Area Planning Agency (MAPA), in cooperation with Offutt Air Force Base, local jurisdictions, agencies and organizations in the region, has prepared a draft Joint Land Use Study (JLUS) to address compatibility planning around Offutt Air Force Base, located adjacent to the City of Bellevue.  The primary objective of the JLUS is to reduce potential conflicts between Offutt Air Force Base and surrounding areas while accommodating new growth and economic development, sustaining economic vitality, protecting public health and safety, and sustaining the operational missions of the base.   The Offutt Air Force Base Public Draft JLUS was released on July 15, 2015 for a 30-day public review and comment period ending on August 15, 2015.

In order to develop a plan that is responsive to local needs, input from the public is essential.  At the July 28, 2015 workshop at the Bellevue University Administrative Services Building, attendees will be provided an overview of the JLUS process and the key findings and recommendations contained in the Draft JLUS documents.  Public comments on these draft documents will be accepted at the meeting, as well as up until the end of the comment period on August 15, 2015.  Written comments can be provided on the project website or by e-mailing comments to Matthew Roth, MAPA Project Manager, This email address is being protected from spambots. You need JavaScript enabled to view it..

The Offutt Air Force Base Public Draft documents, as well as a comment sheet to provide comments, are available by clicking the links below. Due to their size, documents may take a few minutes to download.

Click here to download the Offutt Air Force Base Public Draft Joint Land Use Study (Adobe PDF)

Click here to download the Offutt Air Force Base Public Draft JLUS Background Report (Adobe PDF)

Click here to download the public comment form (Microsoft Word)

Print Email